This year we are building one pod, consisting of two buildings with a lower floor studio and and upper floor (wheelchair accessible) studio in each.
Next step was to dig and form the 13 footings per building. Note the minimal site damage as our hand-digging allows us to keep vegetation right up to the building site.
Amazing work, as always, by the Jimmy Oyola Concrete Crew.
No comments:
Post a Comment