Friday, October 2, 2009

September 1, 2009 3


Walls are up on first floor of each building.
The walls are the fast part. Framing perfectly, decks, boardwalks and stairs take much more time.

Note the black fabric on the top of bldg 1. We are giving the panels an extra bit of waterproofing as we prepare for Tropical Storm Erika.